Koll City of Industry

4 Tilt-Up Industrial Buildings.

Challenge:
This project was constructed immediately adjacent to a heavily traveled section of railroad in addition to SCE high transmission power lines which created some extraordinary safety and coordination challenges.

Notable Fact:
Selected by the Los Angeles Business Journal as the “Best Small New Construction” project in 2008 (Koll Development Company).

Read More
Burke 2006 013
Burke 2006 014
Burke 2006 015

Burke Boeing Phase I

5 Tilt-Up Industrial Buildings.

Challenge:
This project was constructed under several sections of high tension power lines adjacent to an SCE substation. Special care was taken to allow for safe crane operation during the tilt-up phase of construction.

Notable Fact:
This project was the first phase of 3 constructed by PCG for Burke Real Estate Group which included several R & D/Industrial buildings totaling approximately 480,000 sq. ft.

Read More
Burke 2006 017
Burke 2006 018
Burke 2006 019
Burke 2006 020
Burke 2006 021
Burke 2006 022
Burke 2006 023

Burke Sycamore

27 Concrete Tilt-Up Buildings.

Challenge:
A portion of the project was constructed over an “old” high pressure 36” San Diego County water line that was in poor condition. Approximately 300 l.f. of this line had to be fully encased in concrete in 25 ft. segments without damaging the concrete pipe or taking it out of active service.

Notable Fact:
This project was the 2nd phase of a 42 building industrial park constructed for Burke Real Estate Group in Vista, California.

Read More
TALEGA1
TALEGA2
TALEGA3

Burke Talega

15 Concrete Tilt-Up Buildings.

Challenge:
This project was built at the base of two significant (up to 80’ in height) slopes where careful attention was needed for grading operations and retaining wall work.

Notable Fact:
This project combined three distinct product types: R & D, Multi-Tenant Industrial and 100% Office in a single phase 15 building development located in San Clemente, CA.

Read More